The Pet Health Club Shop

Hem and Boo Non Slip Training Long Leads Black (2 sizes)

Hem and Boo Non Slip Training Long Leads Black (2 sizes) - Main image
$10.97 $17.99 In stock

Category: Dog Leads

* Recall and Distance Control
* Durable and Strong
* Rubber Grip for All Weathers

The Hem and Boo training long leads are made from tightly woven nylon with interwoven rubber for extra grip and control.
Ideal for mastering the recall technique and for practising distance control commands.
Coordinate the training long lead with the sports harness and collar.

Available in 2 Sizes: 3m x 1.5cm/ 5m x 1.5cm.

Details

  • Non Slip Material for Extra Grip
  • Perfect for All Weather Recall and Distance Control
  • Padded Neoprene Handle
Check your selection

Confirm your chosen option and quantity before paying.

Delivery timing

Check the estimate before ordering for a particular date.

Standard Shipping: Handling (business days) 0–1; Transit (business days) 7–15.

Express Shipping: Handling (business days) 0–1; Transit (business days) 7–15.

View policy
Refund enquiries

Contact the store with the order number and item you are asking about.

Please contact us for the refund processing timeframe before returning an item.

View policy
Shipping charges

Review the charge for your selected delivery service.

Standard Shipping · United States: $0.00

Express Shipping · United States: $3.99

View policy
Planning a return

Contact the store before returning an item; the policy below applies.

United States · Return window (days after delivery): 30. Return method: By mail. Return postage: Seller pays.

View policy

Customer Reviews (4.8 / 5 · 4 reviews)

Charlotte B. ★★★★★

The interwoven rubber along the whole lead gives me a solid grip even when my dog bolts after a squirrel in the rain. It’s held up through months of daily training without fraying, and the length gives me real confidence for recall work.

Owen P. ★★★★★

The rubber grip on the handle is a game-changer for wet hands, and the 10-meter length gives my dog plenty of room to explore without me losing control. It's held up well to pulling and mud so far.

Chloe ★★★★★

The rubber grip woven into the nylon is a game-changer for wet, muddy walks—my hand never slipped once while letting her roam ahead. I've been using it daily for two weeks and the weave still looks brand new, no fraying or tangling issues.