The Pet Health Club Shop

Hem and Boo Non Slip Double Handle Long Lead

Hem and Boo Non Slip Double Handle Long Lead - Main image
$10.34 $14.99 In stock

Category: Dog Leads

* Double Handle for Extra Control
* Durable and Strong
* Rubber Grip for All Weathers

The Hem and Boo double handle long lead is made from tightly woven nylon with interwoven rubber for extra grip and control.
A longer length lead to give your dog more freedom to explore and use their senses.

Size: 180cm x 1.5cm.

Details

  • Non Slip Material for Extra Grip
  • Double Handle for Extra Control
  • Padded Neoprene Handle
Check your selection

Confirm your chosen option and quantity before paying.

Delivery timing

Check the estimate before ordering for a particular date.

Standard Shipping: Handling (business days) 0–1; Transit (business days) 7–15.

Express Shipping: Handling (business days) 0–1; Transit (business days) 7–15.

View policy
Refund enquiries

Contact the store with the order number and item you are asking about.

Please contact us for the refund processing timeframe before returning an item.

View policy
Shipping charges

Review the charge for your selected delivery service.

Standard Shipping · United States: $0.00

Express Shipping · United States: $3.99

View policy
Planning a return

Contact the store before returning an item; the policy below applies.

United States · Return window (days after delivery): 30. Return method: By mail. Return postage: Seller pays.

View policy

Customer Reviews (4.8 / 5 · 4 reviews)

Samuel C. ★★★★★

The rubber grip is a lifesaver on wet morning walks, my hand doesn’t slip even when she lunges at a squirrel. The woven nylon feels tough and shows no fraying after two months of daily use, and I love having that second handle close for quick control near roads.

Olivia K. ★★★★★

The double handles make a huge difference when I need to quickly shorten the lead near traffic or other dogs. It's sturdy without being too stiff, and the rubber grip is a nice touch for wet weather walks.

Avery ★★★★★

I love how the rubber grip stays secure even in the rain, which was a huge issue with my old nylon lead. The double handle gives me solid control when we pass other dogs, and the length is perfect for letting her roam a bit on hikes.